Tweed Foundation Case Study

This project involved preventing further riverbank erosion caused by river currents using willow spiling to bolster the riverbank.

Riverbank erosion caused by high water levels and strong currents. Riverbank erosion caused by high water levels and strong currents. Land loss and fence line requiring moving, at high cost.
Willow ecoshutteres being installed prior to backfilling to prevent further erosion. Willow Ecoshutters being installed prior to backfilling, to prevent further riverbank erosion.
Willow panels installed to prevent further erosion. After 18 months erosion has stopped completely and the willow is growing well, stabilising the river edge.
Accept Cookies?
Provided by OpenGlobal E-commerce